Public Works and Environmental Services

CONTACT INFORMATION: Our administrative offices are open 8 a.m. – 4:30 p.m., Mon - Fri
703-324-5500 TTY 711
12000 Government Center Parkway
Suite 449, Fairfax, Va 22035
Joni Calmbacher
Director, Stormwater Planning

Stormwater Improvement Projects

SPOTLIGHT PROJECTS

DPWES has selected the following projects to spotlight with detailed information regarding background, benefits, and what to expect.

Project Name Image Description District * Watershed
Accotink Creek Tributary at Carrleigh Parkway Accotink Creek Tributary at Carrleigh Parkway The project will restore approximately 2,400 linear feet of unstable stream channel to minimize erosion and sediment loss, protect public infrastructure, and enhance site ecology. Braddock District Accotink Creek
Big Rocky Run Downstream of Braddock Road Big Rocky Run Downstream of Braddock Road This project seeks to restore up to 3,800 linear feet of stream and tributaries to Big Rocky Run within Rocky Run Stream Valley Park between Braddock Road and Awbrey Patent Drive. Sully District Cub Run
Colvin Run Phase II at Lake Fairfax Park Stream Restoration Colvin Run Phase II at Lake Fairfax Park Stream Restoration This project will restore about 4,454 feet of stream channels in Lake Fairfax Park using a large amount of woody debris in floodplains, reconnecting the stream to its floodplain where possible, and employing multiple unique engineered grade control struc Hunter Mill District Difficult Run
Dead Run at Georgetown Pike Stream Restoration Dead Run at Georgetown Pike Stream Restoration The project includes restoration of approximately 5,600 linear feet of Dead Run, its tributaries, stormwater outfalls and the floodplain within the stream valley between Churchill Road and Georgetown Pike. Dranesville District Dead Run
Difficult Run Tributaries and Basins Restoration at Government Center Difficult Run Tributaries and Basins Restoration at Government Center This project will consist of approximately 1,600 linear feet of stream restoration using Natural Channel Design (NCD) standards and dredging of two amenity ponds to improve stream health and water quality. Braddock District Difficult Run
Dogue Creek at Old Mill Road Dogue Creek at Old Mill Road The project will restore approximately 2,800 linear feet of stream channel. The existing channel is unstable as evidenced by raw stream banks and the widening stream channel. Mount Vernon District Dogue Creek
Headwaters of Popes Head Creek at Brecon Ridge Subdivision Stream Restoration Project Headwaters of Popes Head Creek at Brecon Ridge Subdivision Stream Restoration Project The project will restore approximately 3,000 linear feet of Popes Head Creek, stabilize stormwater outfalls, and re-establish the stream valley floodplain connection and riparian corridor. Springfield District Popes Head Creek
Kent Garden Neighborhood Stormwater Improvement Project Kent Garden Neighborhood Stormwater Improvement Project This neighborhood stormwater improvement project will evaluate the existing concrete channel that conveys the majority of flow in the neighborhood and will improve the capacity of the system thereby reducing localized flooding and addressing public safety Dranesville District Pimmit Run
Little Pimmit Run Tributary at Woodland Terrace Stream Restoration Little Pimmit Run Tributary at Woodland Terrace Stream Restoration The project will restore up to approximately 1,000 linear feet of an unnamed tributary to Little Pimmit Run between Forest Lane and North Albemarle Street in McLean. The drainage system at Chesterbrook Road and North Albemarle Street has a history of drai Dranesville District Pimmit Run
Long Branch Central Watershed Management Area Project Long Branch Central Watershed Management Area Project This project will restore about 34,000 linear feet of stream in the watershed which runs from Maple Avenue on the west to Wakefield Chapel Road on the east. Braddock District Accotink Creek

Fairfax County Stormwater Management is dedicated to protecting and restoring our vital natural resources through the implementation of stormwater management projects throughout the county.

For additional information, please email the Stormwater Planning Division or call 703-324-5500, TTY 711.

Wakefield Park Stream Restoration

Projects Map

STORMWATER MANAGEMENT PROJECTS MAP

Find stormwater management projects by searching for an address. Click on the map icon to view information about the project.

Use the Project Filter to show projects in a watershed or managerial district. Active projects shown as green circles may be in design or construction phases. Use the Projects by Status filter to also see information on completed projects. Note that some projects may be implemented in stages.

Click the Filter icon on the map to turn the Project Filter on or off. Filter Icon

Featured Projects List

Search

  • To search by project name enter any part of the name.

Filter

  • To select a district, chose from the dropdown options. If no district is displayed, the project crosses districts or is in Fairfax City.
  • To filter by the type of project, choose from the list. Use the <Ctrl> key to select multiple types or to unselect a choice.

Sort

  • Click on the column heading in the table header to sort by the column. Click the heading again to reverse the sort order.

After selecting or changing filter criteria, click Apply.

Watershed Management Plans
Fairfax Recovery Wheel